Completed Projects
|
PROJECT TITLE:
|
Food and Drug Administration Indefinite Quantities/ Preventative Maintenance Service
|
|
LOCATION:
|
10 buildings in Rockville and Gaithersburg, Maryland
|
|
OWNER/CLIENT:
|
Food and Drug Administration
Hillian Brothers and Sons, Inc. (Prime Contractor)
Federal Government
|
Point of Contact (Hillian):
Title:
Current Phone #:
Point of Contact (FDA):
Current Phone #:
|
Alan Auslaender
Project Manager
301 772 8861
Jack Harman
301 827 7076
|
PROJECT DESCRIPTION:
Project Size:
Start/Completion:
|
Approx. $200,000-400,000 per year
November 1997-renewed in November 1998
|
The Indefinite Quantities Contract is a unit pricing renovation contract for projects such as the installation of new equipment, ductwork, plumbing fixtures and piping. All types of HVAC equipment are provided from Computer Room Units to DDC control systems for individual buildings. We have accomplished design/build tenant renovations where we performed heat/load calculations and then modified existing systems to accommodate the new tenant specifications.
Revis Engineering, Inc. provides preventative maintenance service for ten buildings in Rockville and Gaithersburg for the Food and Drug Administration. We perform routine maintenance and repairs for the equipment accepted under our service contract, as well as replacing/overhauling equipment as needed. During the initial phase of the contract, Revis Engineering inspected and tested each piece of equipment for proper operation. In many cases, we have been able to improve their performance and efficiency.
|
PROJECT TITLE:
|
Panda Brandywine Cogeneration Plant
|
|
LOCATION:
|
Brandywine, Maryland
|
|
OWNER/CLIENT:
|
Panda Brandywine L.P. (Owner)
Raytheon Constructors & Engineers (Client/Prime Contractor)
Privately-owned with State Cooperation
|
Point of Contact (Raytheon):
Title:
Current Phone #:
|
Bill Dawson
Warranty Manager (Raytheon Power Group)
609-720-3293
|
PROJECT DESCRIPTION:
Project Size:
Start/Completion:
|
Approx. $478,000
November 1995-September 1996
Warranty/C.O. work through April 1998
|
Revis Engineering, Inc. fabricated and installed the industrial supply and exhaust ductwork system for the main Combustion, Steam Turbine and Administration buildings at the Brandywine Co-generation Plant in Brandywine, Maryland. REVIS furnished and installed the HVAC controls and gas-fired unit heaters for the plant. We also installed the owner-supplied PRVs and HVAC equipment for the complex. The project was completed on time and REVIS was asked to return to perform some warranty service for Raytheon later on that year. REVIS installed sound attenuation units in the main high-pressure and intermediate pressure start-up vents. We were also responsible for insulating the vent stacks and associated piping.
|
PROJECT TITLE:
|
U.S. Pension Building Energy Management Control System
|
|
LOCATION:
|
4th and F Streets, N.W. Washington, DC 20405
|
|
OWNER/CLIENT:
|
General Services Administration
R.D. Smith Builders, Inc. (Client/Prime Contractor)
Federal Government
|
Point of Contact (DZFSI):
Title:
Current Phone #:
Note:
|
Joe O'Neil
Building Manager (DZFSI)
202 393 6251
Suzanne Harness and Mike Oliveri, the GSA representatives managing this project are no longer with GSA.
|
PROJECT DESCRIPTION:
Project Size:
Start/Completion:
|
Approx. $215,000
September 1994-September 1995
|
Revis Engineering, Inc. installed and programmed a complete energy management control system for the National Building Museum at the U.S. Pension Building at 401 F Street, NW Washington. The CSI-based DDC system allows full control of the building's HVAC system. We installed the system from the ground up, pulling all necessary wiring and testing all the components for proper performance. The system was completed on time and is currently in operation. REVIS provided the project management and performed complete in-house installation and programming for the system.
|
PROJECT TITLE:
|
NIST Perchloric Acid Exhaust System
|
|
LOCATION:
|
Building 245, Gaithersburg, Maryland
|
|
OWNER/CLIENT:
|
National Institute of Standards and Technology
Hillian Brothers and Sons, Inc. (Prime Contractor)
Edmar Construction Company (General Contractor)
Federal Government
|
Point of Contact (Hillian):
Title:
Current Phone #:
Point of Contact (NIST):
Current Phone #:
|
Alan Auslaender
Project Manager
301 772 8861
Ron Harter
301 975 6904
|
PROJECT DESCRIPTION:
Project Size:
Start/Completion:
|
Approx. $140,000
December 1996-June 1997
|
Revis Engineering, Inc. furnished and installed a media fume scrubbing filtration system for a perchloric acid fume hoods at NIST Building 245. The project included the fabrication and installation of teflon-coated stainless steel exhaust ductwork and blowers. REVIS also furnished and installed a complete CSI-based DDC control system for the laboratory. The project included a significant degree of in-house engineering and technical consultation. The project was completed on time and is currently in operation.
Revis Engineering, Inc.
Principal Contacts: Homer Revis / Jeff Revis
PO Box 223
Clinton, MD 20735
Phone: 301.856.2400
Fax: 301.856.8859
Email: Jeff.Revis@verizon.net
|